Last week, Zehr Construction installed two new steel exterior doors to replace two that were rusting, the door in the fellowship hall and the door going to the basement and furnace room. Wednesday, this week, Bill’s Heating was out and installed three new high performance furnaces replacing three old furnaces that were installed in 1980.